BIZIDEA STARTUP DOSSIERS
X-ENERGY · industrial · Scan 2026-04-01 to 2026-04-26

Supplier-readiness OS for advanced nuclear teams to qualify vendors, trace parts, and survive first-plant audits.

Advanced nuclear developers are no longer just selling a reactor concept; they are standing up first commercial plants, fuel operations, and project-delivery organizations at the same time. That creates a brutal operational bottleneck: qualifying a new supplier base, collecting nuclear-grade QA evidence, and proving traceability across thousands of parts, lots, procedures, and audits.

Overall rating 3.3 / 5.0
  1. 2
    Market

    $37.5M TAM and $18.1M SAM are small today despite nuclear tailwinds; four credible substitutes and a buyer base in the dozens cap upside.

  2. 4
    Differentiation

    Nuclear-specific supplier qualification, genealogy, and audit packets are sharper than horizontal QMS tools, with a credible data moat if adopted.

  3. 3
    Execution

    Plan clarity is strong and LTV/CAC is 6.6 with 7.6-month payback, but four model flags and late breakeven leave little room for delay.

  4. 5
    Timeliness

    April 2026 brought six converging signals, including an upsized IPO and first-day pop, making nuclear supply-chain execution newly urgent.

Why now
  1. Public investors just validated that advanced nuclear companies can raise large pools of capital when linked to real demand, which increases pressure to execute commercial projects on schedule.
  2. AI data centers, electrification, and industrial load growth are pulling reactor projects forward, so procurement teams need new qualified suppliers sooner than the legacy nuclear base can absorb.
  3. A reactor-plus-fuel business model creates more interfaces, components, lots, and compliance artifacts to track than a single equipment sale.
  4. X-energy's leadership mix heavily weights regulatory, contracts, procurement, quality, and operations, a strong clue that commercialization bottlenecks are now supply-chain and compliance heavy.

Catalyst. X-energy's upsized IPO and explicit emphasis on supply chain, compliance, and commercial execution signal that advanced nuclear is entering a supplier-heavy deployment phase now.

The idea

The product is a system of record for nuclear supplier readiness. It gives advanced nuclear programs a structured workflow to qualify vendors, collect NQA-1 and project-specific evidence, manage corrective actions, and maintain a live approved manufacturer list tied to actual components and lots. It also creates a project-level digital thread from purchase order to delivered part to audit packet, so commercial, quality, and regulatory teams stop rebuilding the same evidence by hand. The initial product should integrate with existing PLM, ERP, document management, and QMS systems rather than replace them, making adoption realistic for first customers. Over time, the company can build a proprietary compliance graph of suppliers, components, evidence requirements, and performance history.

Beachhead Supplier qualification and audit-package generation for U.S. advanced nuclear developers standing up their first commercial reactor and fuel supply chains
Wedge A nuclear-specific supplier readiness system that onboards vendors, maps required certifications and procedures, tracks part and lot genealogy, and auto-assembles audit-ready evidence packages by project and component
Non-obvious insight The investable bottleneck in advanced nuclear is shifting from reactor science to commercialization plumbing. X-energy's IPO, full-stack reactor-plus-fuel model, and leadership buildout imply that supplier qualification, QA traceability, and regulatory evidence management are becoming the real schedule-critical layer.
Venture-scale path Start with supplier qualification for first advanced nuclear projects, then expand into ongoing quality operations, field-service traceability, fuel and component genealogy, lender and insurer reporting, and adjacent regulated manufacturing sectors such as defense, aerospace, and grid infrastructure.
Nuclear supplier readiness wedge
flowchart LR
  Buyer[Advanced nuclear supply-chain leader] --> Pain[Supplier qualification and audit chaos]
  Pain --> Product[Supplier Readiness OS]
  Product --> Outcome[Faster approved vendors and lower schedule risk]
Market
Sizing
TAM $37.5M 45 active first-wave advanced-nuclear projects globally x $0.5M est. annual platform spend + 120 supplier-side organizations x $0.125M est. annual spend = $37.5M.
SAM $18.1M Constrain to U.S./UK first-wave programs and near-term allied suppliers: 20 projects x $0.5M + 65 supplier organizations x $0.125M = $18.125M.
SOM $4.0M Reachable year-3 case of 5 active projects and 12 supplier organizations through design-partner sales into first deployments: 5 x $0.5M + 12 x $0.125M = $4.0M.

Executive takeaways

  • Public-market and hyperscaler signals suggest advanced nuclear demand is real, but the software opportunity sits in execution plumbing rather than reactor science.
  • The beachhead is strategically important but economically narrow; near-term buyer count is measured in dozens, so the venture case depends on later expansion into adjacent regulated manufacturing.
  • Generic QMS/MES tools already serve regulated manufacturers, but they do not market a nuclear-specific workflow for supplier qualification, lot genealogy, and audit-package assembly across reactor and fuel programs.
Nuclear supplier-readiness market map
quadrantChart
  title Nuclear supplier-readiness market map
  x-axis Generic workflow --> Nuclear-specific workflow
  y-axis Low urgency --> High urgency
  ETQ Reliance: [0.30, 0.56]
  AssurX: [0.38, 0.60]
  MasterControl: [0.26, 0.42]
  In-house + consultants: [0.58, 0.73]
  Proposed startup: [0.88, 0.92]
Competition
Competitor Stage Wedge Weakness vs. us
ETQ Reliance incumbent Broad enterprise QMS with 40-plus applications including supplier quality, CAPA, audits, and document control. Horizontal positioning; not marketed around nuclear supplier qualification, component genealogy, or regulator-ready audit packages across reactor and fuel programs.
AssurX incumbent Enterprise quality and supplier-quality software with explicit energy-and-utilities positioning. More generic quality/compliance framing than nuclear-specific readiness, with limited evidence of project/component-level nuclear traceability.
MasterControl Manufacturing Excellence incumbent Paperless manufacturing, MES, logbooks, and audit-ready quality workflows for regulated production. Skews toward life-science manufacturing operations rather than pre-award supplier qualification and first-reactor evidence chains.
In-house stack plus consultants incumbent substitute Existing ERP/PLM/document repositories, internal PMOs, and domain consultants. Labor-heavy, fragmented, and poor at producing reusable supplier graphs or live executive visibility across projects.

Why incumbents do not win by default

  • Generic QMS suites. Broad quality vendors already cover CAPA, audits, and document control, but their positioning is horizontal; a nuclear-specific wedge wins only if it encodes supplier qualification, part genealogy, and audit evidence faster than a custom implementation on a generic stack.
  • Cloud and digital-thread platforms. Large platforms can integrate data, but buyers still need a prebuilt nuclear workflow and evidence model; otherwise the startup's risk is being treated as another services-heavy configuration project.
  • In-house stack plus consultants. This substitute wins by default on trust, but it scales poorly because evidence remains fragmented across procurement, licensing, construction, and fuel teams; the startup wins only if it reduces manual coordination without forcing stack replacement.
  • Reactor OEM and owner-operator internal tools. OEMs will build internal processes for themselves, but they are not natural cross-program network software vendors; a neutral supplier-readiness layer can win if it helps both developer and supplier organizations operate across multiple projects.
Business plan

Advanced nuclear is moving from reactor science to commercial execution, and X-energy's IPO plus hyperscaler-backed demand make supplier readiness a schedule-critical bottleneck now. The proposed company sells a nuclear-specific supplier-readiness OS to first-wave advanced nuclear developers standing up reactor and fuel supply chains. The initial user is a VP of Supply Chain or Chief Quality team that must qualify vendors, maintain approved-supplier logic, and assemble audit-ready evidence without slowing procurement. The MVP should integrate with PLM, ERP, document systems, and generic QMS tools rather than replace them, so adoption can start on one project and one component family. The beachhead is attractive because days-to-approval and audit-prep hours are measurable and board-visible, creating a credible paid-pilot motion. Research supports real demand but a narrow near-term market, with estimated TAM of $37.5M, SAM of $18.1M, and year-3 SOM of $4.0M inside advanced nuclear alone. That means the venture case depends on winning the nuclear wedge first, then expanding into fuel genealogy, multi-project compliance, supplier network modules, and adjacent regulated manufacturing sectors. The main disconfirming risk is timing: if first-wave projects slip or buyers extend incumbents with services, sales cycles may outrun early-stage runway. A disciplined plan is to secure 2-3 design partners, prove one narrow workflow in production, and use domain credibility as the first moat.

Beachhead U.S.-based advanced nuclear developers entering first commercial procurement for reactor and fuel programs, starting with supplier qualification and audit-package generation for one component family.
Wedge rationale This entry point sits before plant operation, ties directly to financing and vendor-award urgency, and can be proven on one live workflow faster than a broad attempt to replace QMS, MES, or PLM infrastructure.
Sequencing The company should first hire domain credibility and ship an integration-first MVP, then close design partners around a named project, then expand only after pilot data proves ROI and security/compliance reviews are passable. Broad outbound sales, supplier monetization, and adjacency expansion should wait until implementation playbooks are repeatable.
Not yet Full PLM or QMS replacement · Utility operations for large conventional nuclear plants · Defense, aerospace, and grid-equipment expansion before two nuclear production deployments · Supplier-paid standalone product before developer-side budget is proven

Milestones

0–12 months
  • Secure 2-3 design partners in U.S. advanced nuclear programs
  • Launch 1 paid pilot on a named component-family workflow
  • Prove at least 30% improvement in supplier approval cycle time or audit-prep labor
  • Ship baseline integrations for document systems plus one ERP or PLM connector
  • Build a nuclear-grade security and compliance review package
12–24 months
  • Convert at least 2 nuclear customers to production subscriptions
  • Expand from supplier qualification into genealogy and recurring audit workflows
  • Launch supplier collaboration module and reusable evidence-template library
  • Validate 1 adjacency path outside advanced nuclear
  • Establish partner-led implementation support for repeat deployments
24–36 months
  • Manage production workflows across 5 active projects and 12 supplier organizations
  • Demonstrate cross-project supplier performance graph as a defensible data asset
  • Expand into one adjacent regulated manufacturing segment if nuclear timing and economics support it
  • Reach a repeatable pilot-to-production motion with implementation scoped as a standard package
Strategy map
flowchart LR
  Wedge[Supplier qualification and audit wedge] --> MVP[Integration-first MVP]
  MVP --> Proof[Cycle-time and audit-labor proof]
  Proof --> Expansion[Multi-project and fuel-workflow expansion]
  Expansion --> Moat[Supplier and evidence graph moat]
Investor verdict
Call Watch
Why believe X-energy's IPO, supplier buildout, and fuel commercialization all support the thesis that supplier readiness is now a real execution bottleneck.
Why doubt The near-term buyer universe is measured in dozens, and incumbent systems plus consultants may absorb enough of the workflow to cap venture returns.
Next diligence Win one paid design partner tied to a live procurement milestone and prove a faster supplier-approval or audit-package workflow without replacing incumbent systems.
Financial model
3-year totals
Year 1 revenue $385K EBITDA $-878K · Cash EOP $1.72M
Year 2 revenue $1.80M EBITDA $-704K · Cash EOP $1.02M
Year 3 revenue $3.33M EBITDA $-288K · Cash EOP $730K
Unit economics
ARPU (annual) $296K
Gross margin 70%
CAC $130K Payback 7.6 months
LTV / CAC 6.6x LTV $858K
Funding ask
Round pre-seed · $2.6M
Runway 24 months
Milestone Reach 2 production nuclear customers, prove partner-assisted deployments, and enter seed raise with Q4Y3 EBITDA above breakeven.

Model sanity

  • Revenue engine. Base case revenue comes from converting five $192K developer pilots into $540K production projects and then layering eight $144K supplier modules by Q4Y3.
  • Must go right. Pilot conversions need to happen inside 6-9 months so a small GTM team can fund later supplier expansion without another early bridge round.
  • Model breaks if. If reactor or fuel program timing slips by two quarters, downside cash goes negative before the company reaches seed-quality proof.
  • Next-round proof. The next round is justified when two production nuclear customers are live, partner-assisted deployments cut delivery drag, and Q4Y3 EBITDA turns positive.
Revenue, cash, and EBITDA — 12-month Y1 + 8-quarter Y2/Y3
$0K$500K$1.00M$1.50M$2.00M$2.50MM1M4M7M10Q1Y2Q4Y2Q3Y3Q4Y3
  • Revenue (line, area)
  • Cash EOP (dashed)
  • EBITDA (bars, gray = loss)
Use of funds — $2.6M pre-seed
Engineering · 42% GTM · 24% G&A · 17% Buffer (6 mo) · 17%
Headcount build by role — peak 13 FTE
Q1Y13Q2Y14Q3Y16Q4Y16Q1Y28Q2Y29Q3Y210Q4Y210Q1Y311Q2Y312Q3Y313Q4Y313
  • CEO
  • Engineering
  • Nuclear QA/Product
  • Solutions/CS
  • Sales/GTM
  • G&A/Ops
Year-3 scenarios — base / downside / upside
Y3 revenueY3 EBITDACash low pointDescription
Downside$2.33M-$790K-$180KTwo developer programs slip by two quarters, pilot conversion stretches to 9 months, and supplier modules start one half later.
Base$3.33M-$288K$718KFive developer projects convert on schedule and eight supplier modules are added through Y3 with no modeled logo churn.
Upside$4.08M$120K$820KOne extra developer closes in Y2, supplier modules reach 10 by Q4Y3, and templates compress implementation load faster than planned.
Sensitivity — Y3 cash and revenue impact, sorted by magnitude
VariableDownsideUpsideCash impactRevenue impact
sales cycleAverage sales cycle extends from roughly 6 months to 9 months.Budget releases around financing and permit milestones pull deals forward by one quarter.-$360K-$520K
hiring paceTwo hires are pulled forward by two quarters before revenue catches up.One non-core hire is delayed until after the second production conversion.-$330K$0K
CACCAC rises 20% as deals require more travel, security diligence, and founder time.CAC falls 15% as referrals and partner channels mature.-$260K-$180K
ARPUDeveloper production contracts price 10% below base and supplier modules land at $130K ARR.Developer projects land near $600K ARR with the same logo count.-$250K-$333K
churnMonthly churn moves to 3% once first renewals arrive.Monthly churn stays near 1% because projects are tied to long program timelines.-$170K-$210K
gross marginGross margin reaches only 64.5% because implementation stays services-heavy.Gross margin reaches 72% with stronger partner-assisted deployment.-$166K$0K
unit economics flow
flowchart LR
  Leads --> DesignPartners
  DesignPartners --> PaidPilots
  PaidPilots --> ProductionProjects
  ProductionProjects --> SupplierModules
  ProductionProjects --> Revenue
  SupplierModules --> Revenue
  Revenue --> GrossProfit
  GrossProfit --> Cash

Flags: The market is still narrow, so five developer projects drive a large share of recurring revenue and concentration risk remains high. · The base case assumes no logo churn in the 36-month revenue cohort build; real renewals could underperform the separate 2% monthly churn heuristic. · Q4Y3 only barely turns EBITDA positive, so a slower deployment tempo would likely require either a larger pre-seed or tighter hiring discipline. · The Q4Y3 exit run-rate is close to the research SOM, so the venture case still depends on adjacency expansion after the nuclear wedge.

Top risks
  • Slow deployment timelines
  • Entrenched incumbent stack
  • Domain trust gap
Evidence

Cited sources (36)

  1. TechCrunch. X-energy’s stock popped 27% on first day of trading following upsized IPO · Fri Apr 24 2026 00:00:00 GMT+0000 (Coordinated Universal Time) · https://techcrunch.com/2026/04/24/x-energy-stock-pops-27-on-first-day-of-trading-following-upsized-ipo
  2. TechCrunch. Nuclear startup X-energy raised $1 billion in its initial public offering · Fri Apr 24 2026 00:00:00 GMT+0000 (Coordinated Universal Time) · https://techcrunch.com/2026/04/24/nuclear-startup-x-energy-raises-1b-in-data-center-driven-ipo/
  3. X-energy Investor Relations. X-energy Announces Pricing of Upsized Initial Public Offering · Thu Apr 23 2026 00:00:00 GMT+0000 (Coordinated Universal Time) · https://investors.x-energy.com/news-releases/news-release-details/x-energy-announces-pricing-upsized-initial-public-offering
  4. TechCrunch. Amazon-backed X-energy files to raise up to $800m in IPO · Wed Apr 15 2026 00:00:00 GMT+0000 (Coordinated Universal Time) · https://techcrunch.com/2026/04/15/amazon-backed-x-energy-files-to-raise-up-to-800m-in-ipo/
  5. U.S. Department of Energy. Advanced Reactor Demonstration Program · https://www.energy.gov/ne/advanced-reactor-demonstration-program
  6. Nuclear Regulatory Commission. Advanced Reactors · https://www.nrc.gov/reactors/new-reactors/advanced.html
  7. World Nuclear Association. Small Nuclear Power Reactors · https://www.world-nuclear.org/information-library/nuclear-fuel-cycle/nuclear-power-reactors/small-nuclear-power-reactors
  8. X-energy. Tim Bendt · https://x-energy.com/leadership/tim-bendt/
  9. X-energy. Robert Taylor · https://x-energy.com/leadership/robert-taylor/
  10. Amazon. Amazon signs agreements for innovative nuclear energy projects to address growing energy demands · Wed Oct 16 2024 00:00:00 GMT+0000 (Coordinated Universal Time) · https://www.aboutamazon.com/news/sustainability/amazon-nuclear-small-modular-reactor-net-carbon-zero
  11. Energy Northwest. Amazon and Energy Northwest announce plans to develop advanced nuclear technology in Washington · https://www.energy-northwest.com/whoweare/news-and-info/Pages/Amazon-and-Energy-Northwest-announce-plans-to-develop--advanced-nuclear-technology-in-Washington.aspx
  12. X-energy. Amazon invests in X-energy to support advanced small modular nuclear reactors and expand carbon-free power · Wed Oct 16 2024 00:00:00 GMT+0000 (Coordinated Universal Time) · https://x-energy.com/media/news-releases/amazon-invests-in-x-energy-to-support-advanced-small-modular-nuclear-reactors-and-expand-carbon-free-power
  13. Google. To accelerate the clean energy transition across the U.S., we’re signing the world’s first corporate agreement to purchase nuclear energy from multiple small modular reactors · Mon Oct 14 2024 00:00:00 GMT+0000 (Coordinated Universal Time) · https://blog.google/outreach-initiatives/sustainability/google-kairos-power-nuclear-energy-agreement/
  14. Kairos Power. Technology · https://kairospower.com/technology/
  15. TerraPower. Terrapower's Natrium Project and the ARDP Partnership · https://www.terrapower.com/natrium/
  16. Oklo. Technology · https://www.oklo.com/technology
  17. ETQ. Reliance quality management software · https://www.etq.com/demo/
  18. AssurX. Supplier Quality Management Software · https://www.assurx.com/supplier-quality-management-software/
  19. MasterControl. Manufacturing Excellence · https://www.mastercontrol.com/manufacturing/
  20. X-energy. X-energy, IHI Corporation Partner to Advance U.S.-Japan SMR Supply Chain Development · Mon Mar 16 2026 00:00:00 GMT+0000 (Coordinated Universal Time) · https://x-energy.com/news/x-energy-ihi-corporation-partner-to-advance-u-s-japan-smr-supply-chain-development/
  21. X-energy. TRISO-X Receives First-Ever Part 70 HALEU Fuel Fabrication License · Fri Feb 13 2026 00:00:00 GMT+0000 (Coordinated Universal Time) · https://x-energy.com/news/triso-x-receives-first-ever-part-70-haleu-fuel-fabrication-license/
  22. X-energy. X-energy, Doosan Enerbility Announce 16-Unit Reservation Agreement and Capacity Expansion to Support 11 GW Pipeline · Thu Dec 18 2025 00:00:00 GMT+0000 (Coordinated Universal Time) · https://x-energy.com/news/x-energy-doosan-enerbility-announce-16-unit-reservation-agreement-and-capacity-expansion-to-support-11-gw-pipeline/
  23. X-energy. X-energy Begins Vertical Construction for First-in-the-Nation Advanced Nuclear Fuel Fabrication Facility · Mon Nov 17 2025 00:00:00 GMT+0000 (Coordinated Universal Time) · https://x-energy.com/news/x-energy-begins-vertical-construction-for-first-in-the-nation-advanced-nuclear-fuel-fabrication-facility/
  24. X-energy. Seadrift · https://x-energy.com/seadrift
  25. X-energy. Matt Welsh · https://x-energy.com/leadership/matt-welsh/
  26. Nuclear Regulatory Commission. Special Nuclear Material · Wed Mar 11 2020 00:00:00 GMT+0000 (Coordinated Universal Time) · https://www.nrc.gov/security/domestic/mca/snm
  27. U.S. Bureau of Labor Statistics. Nuclear Engineers · https://www.bls.gov/ooh/architecture-and-engineering/nuclear-engineers.htm
  28. U.S. Bureau of Labor Statistics. Project Management Specialists · https://www.bls.gov/ooh/business-and-financial/project-management-specialists.htm
  29. TechCrunch. Sam Altman-backed nuclear startup Oklo lands massive data center power deal with caveats · Wed Dec 18 2024 00:00:00 GMT+0000 (Coordinated Universal Time) · https://techcrunch.com/2024/12/18/sam-altman-backed-nuclear-startup-oklo-lands-massive-data-center-power-deal-with-caveats/
  30. X-energy. X-energy Closes Oversubscribed $700 Million Series D Financing Round to Continue Expansion to Meet Global Energy Demand · Mon Nov 24 2025 00:00:00 GMT+0000 (Coordinated Universal Time) · https://x-energy.com/news/x-energy-closes-oversubscribed-700-million-series-d-financing-round-to-continue-expansion-to-meet-global-energy-demand/
  31. X-energy. Dinkar Bhatia · https://x-energy.com/leadership/dinkar-bhatia/
  32. U.S. Department of Energy. TRISO particles: The most robust nuclear fuel on Earth · Tue Jul 09 2019 00:00:00 GMT+0000 (Coordinated Universal Time) · https://www.energy.gov/ne/articles/triso-particles-most-robust-nuclear-fuel-earth
  33. X-energy. XE-100 · https://x-energy.com/xe-100/
  34. X-energy. TRISO-X Fuel · https://x-energy.com/triso-x-fuel/
  35. X-energy. David Royer · https://x-energy.com/leadership/david-royer/
  36. International Atomic Energy Agency. Advanced Reactor Information System | Aris · https://aris.iaea.org/

News scan (24)

  1. TechCrunch. X-energy’s stock popped 27% on first day of trading following upsized IPO · 2026-04-24 · https://techcrunch.com/2026/04/24/x-energy-stock-pops-27-on-first-day-of-trading-following-upsized-ipo
  2. TechCrunch. Nuclear startup X-energy raised $1 billion in its initial public offering · 2026-04-24 · https://techcrunch.com/2026/04/24/nuclear-startup-x-energy-raises-1b-in-data-center-driven-ipo/
  3. X-energy Investor Relations. X-energy Announces Pricing of Upsized Initial Public Offering · 2026-04-23 · https://investors.x-energy.com/news-releases/news-release-details/x-energy-announces-pricing-upsized-initial-public-offering
  4. X-energy Investor Relations. X-energy Announces Launch of its Initial Public Offering · 2026-04-15 · https://investors.x-energy.com/news-releases/news-release-details/x-energy-announces-launch-its-initial-public-offering
  5. X-energy Investor Relations. X-energy Investor Relations · https://investors.x-energy.com/
  6. X-energy. X-energy · https://x-energy.com/
  7. X-energy. Our Mission · https://x-energy.com/our-mission/
  8. X-energy. XE-100 · https://x-energy.com/xe-100/
  9. X-energy. TRISO-X Fuel · https://x-energy.com/triso-x-fuel/
  10. X-energy. Emerging Technologies · https://x-energy.com/emerging-technology/
  11. X-energy. The Advantages of Nuclear Energy · https://x-energy.com/blog/advantages-of-nuclear-energy/
  12. X-energy. Leadership · https://x-energy.com/leadership/
  13. X-energy. J. Clay Sell · https://x-energy.com/leadership/j-clay-sell/
  14. X-energy. Daniel Gross · https://x-energy.com/leadership/daniel-gross/
  15. X-energy. Steve Miller · https://x-energy.com/leadership/steve-miller/
  16. X-energy. Dinkar Bhatia · https://x-energy.com/leadership/dinkar-bhatia/
  17. X-energy. Benjamin Reinke · https://x-energy.com/leadership/benjamin-reinke/
  18. X-energy. Matt Welsh · https://x-energy.com/leadership/matt-welsh/
  19. X-energy. Joel Duling · https://x-energy.com/leadership/joel-duling/
  20. X-energy. Dragan Popovic · https://x-energy.com/leadership/dragan-popovic/
  21. X-energy. Robert Taylor · https://x-energy.com/leadership/robert-taylor/
  22. X-energy. David Royer · https://x-energy.com/leadership/david-royer/
  23. X-energy. Tim Bendt · https://x-energy.com/leadership/tim-bendt/
  24. X-energy. Bobby Dean · https://x-energy.com/leadership/bobby-dean/